BEST ACCESS SYSTEMS 35HW Manuel de service Page 107

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 228
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 106
Service and Maintenance for Mortise Locks
W Series Service Manual 4–53
Reinstalling the RQE switch
1. Make sure that the new RQE switch components are oriented
correctly. When installed, the pivot point on the RQE switch should
be opposite the flat side of the outside hub, as shown in Figure 4.48.
Note: If you need to change the orientation of the RQE switch, see
step 3 through step 5, Task C. To turn over the RQE switch: on
page 4–44.
2. Tilt the RQE switch forward and slide it into place in the case.
3. Clamp the RQE wires or cable in the strain relief. Slide the strain
relief into position on the case. It should lock into place.
4. Reinstall the hubs. The flat side of the outside hub should be
opposite the pivot point on the RQE switch.
5. Reinstall the mortise case cover and case spacer. See Task H. To
reinstall the mortise case cover and case spacer: on page 4–48.
6. Reinstall the mortise case. See Task B. To reinstall the mortise case:
on page 4–14 or Reinstalling components for electrified mortise
locks on page 4–32.
Replacing the door
status switch
Removing the door status switch
1. Remove the mortise case. See Removing components for IDH Max
Mortise Locks on page 4–3 or Removing components for electrified
mortise locks on page 4–26.
2. Remove the mortise case cover and spacer. See Task A. To remove
the mortise case cover and case spacer: on page 4–43.
3. Remove the wire strain relief from the case.
4. Open the wire strain relief and remove the door status switch wires
or cable.
Vue de la page 106
1 2 ... 102 103 104 105 106 107 108 109 110 111 112 ... 227 228

Commentaires sur ces manuels

Pas de commentaire